[MW:11633] Re: 6GR position

Figure 4.13 in AWS D1.1:2010 shows an optional machining procedure for
6GR side bends

On Jul 7, 7:47 am, Martin Prad <martin_p...@hotmail.com> wrote:
> Hi experts,
>
> I would like to clear a point regarding the welder qualification in 6GR position. When the welder qualification test is carried out in 6GR position the ID of the pipe (6"x16mm is welded to 6"x22 mm with plate restriction as per Fig. 4.27 AWS D1.1) is offset. When the test pieces are prepared for bend test is it required to skim the root (offset) section by removing the offset or left as welded and carry out the bend test?
>
> Kind regards,
> Martin.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

[MW:34820] RE: 34813] Clarification in Rate of heating and cooling.

Hello,   Please see the response below.   Regards.   P. Goswami, P. Eng, IWE.   From: materials-welding@googlegroups.com <materials-weld...