Tuesday, May 17, 2011

[MW:11066] Re: GRE pipings

First of all it seems u have lost the basic specs of the project
without which u couldn't have started the material purchase itself.
please ask the client for the specs with design pressure requirements
and from ther u have to work as general piping for all test
procedures...make sure to consult the maufacturer for precautions to
be taken and never leave the line pressured unattended as the pressure
tends to vary very soon with temperature variation and use at least
two callibrated pressure gauges to safeguard against possible faulty
problems.
1. find job design pr. requirements and test accordingly as per local
standards applicable
2. confirm correct materials used
3. make method statement fro approval as u wish to do the test
involving the test pr., hold time, and other parameters.
4. client to approve the same
5. pigging or others as relevant to be done before test
6. hookup the full lines with vents and emergency drain at operation
point
7. make available sufficient crew to monitor operation
8. choose time with least temperature fluctuations ...avoid afternoon
times.
9. make a prayer and go AHEAD....All the best


On May 15, 3:01 pm, "k.ilangkumaran ilangkumaran"
<k.ilangkuma...@yahoo.com> wrote:
> Dear Experts,
>  
>           I'm working as TPI and representing ADNOC and my contractor who is doing GRE piping works. some of the works completed and I have checked them and found ok.
>  
>       Now GRE piping installed and the pipings needs to be hydro tested. But I haven't been provided any documents regarding the procedures like method os statement for the hydro testing. I dont know even what pressure is? what is the holding time? no details were given in the drawing. How many pressure gauges to be used? where it is needed recorder etc,
> NO QCP/ITP/hydro testing procedures.
>  
> Can anyone explain me how to sort out this problem? And what are the documents shoul I ask prior to this job?if possible some procedures and stds can be sent it to me.
>  
> Thanks in advance

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.