Hi,
         1) You did not mention because of why the work was stopped.
 
          2)You can start the welding but before you conform with the MPI any crack is there or not.If there is no crack then u can proceed the job as per the specification.
 
         with thanks,
         N.S. Sundaram

On Fri, Feb 11, 2011 at 8:01 PM, <eldhoisaac@rediffmail.com> wrote:
Dear All,

Presently I am working in a cross pipeline project, an unexpected problem has occurred during the production,due to which the welding had to be stopped,but there is 19 joints which has completed only the (root + hot-pass),still there is (Filler 1 + Filler  2 + Capping) balance and the joints has been left open for more than 48hrs.

My doubt is, if I want to resume the welding now ,whether I have to cut out all the 19 joints and re-weld  ? 
or
Should I reheat and resume with the welding.?

If the joints has to be cut out where is it mentioned so (any applicable code)

The Pipe is = API 5L -Gr.X65 
Electrodes are E6010 (Root) and E7010(Filler+ Capping)
Code : API 1104.


Kindly please suggest your expert advices on this issue.

Thanking You,

Eldho Isaac.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

[MW:34866] Presentation for WPS ,PQR AND WPQ as per ASME Sec IX in power point

Dear Experts.        If anyone having presentation of WPS,PQR and WPQ  as per ASME  SEC.IX  in power point then please share . Regards Sanja...