Re: [MW:8833] WQT

Dear Rishikesh

1) Welding Procedure is qualifiied only when the Mechanical tests are
passed. You cannot start welding before a procedure is qualified.
Do not look at WPS/PQR as a code requirement. Look at it as a Trial
procedure to verify the procedure you are going to use for production
welding will serve the purpose. Your tiral procedure fails means your
production is also going to fail. This should be the attitude.

2) NDT is to verify the weld is free from unacceptable defects.

A weld is free from defect in NDT does not mean it will pass the
mechanical tests. Mechanical test is to ensure the joint and weld
metal is have minimum tesile properties, impact properties,
hardness, microstructure and to ensure the compatibility of weld metal
to base metal. These can be verified only by mechanical testing.

3) Welder qualifiaction - is to test the ability of weld metal to
produce a sound weld. Code allows this can be done by visual and RT.

When welder qualification is comibed with procedure qualification and
test piece fails to pass mechanical test, then welder qualification
also becomes invalid eventhough the RT is passed.

If mechanical test is failed then all joints need to be cutout.

Thanks

Murugesan


On 12/20/10, Rishikesh Singh <01hrishi@gmail.com> wrote:
> Dear Sirs,
>
> I want to know that in welder qualification test if the NDT is cleared and
> the Destructive testing is awaited then can we start our production weld
> with these welders and what happen in case the Destructive examination is
> failed please reply Sir i m suffering with this problem please.
>
> Regards,
>
> Rishikesh Singh
> Project Engineer(Bharuch)
> A.I.P.L.
> 8128769028
>
> --
> To post to this group, send email to materials-welding@googlegroups.com
> To unsubscribe from this group, send email to
> materials-welding+unsubscribe@googlegroups.com
> For more options, visit this group's bolg at
> http://materials-welding.blogspot.com/
> The views expressed/exchnaged in this group are members personel views and
> meant for educational purposes only, Users must take their own decisions
> w.r.t. applicable code/standard/contract documents.
>

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

Comments

Popular posts from this blog

Re: [MW:34105] SA266 GR4N 4 Cycle SPWHT

Hi,  You are correct, Minimum refers to the one cycle for which this part will expose until final work shop PWHT. hence mill test certificate shall include this.  Max. SPWHT, refers to additional cycles of heat treatment that are reserved for future repairs during equipment lifetime.  Again, these simulated no. Of cycles shall be specified in MTC.  The idea is we need to make sure that steel mechanical properties are not compromised upon exposure to multiple repairs (i e 4 cycles in your case).  One could say, if steel is subjected to 4 cycles and is ok, then it should by defacto be good for one cycle, yet, this is wrong assumption cause mechanical problems and microstructure of materials varies accordingly based on no. Of cycles for which material will expose. This is apparent in alloy steel and especially for impact test values as an example.  In your case, this forged CS with properties before PWHT can be understood to be " as forged" condition (i.e. Wit...

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...