Friday, December 3, 2010

[MW:8503] RE: 8470] Joint Efficiency

Dear Santosh,

                        Kindly follow the following link for discussion, also review UW 14

 

http://www.eng-tips.com/viewthread.cfm?qid=257330&page=3

 

 

Best regards, 

Yassein Abdou

Welding & Grating Manager

energya STEEL FABRICATION 

 

 

 

 

 

 


Egypt Factory & Head Office: Industrial Zone A 6 East, 10th of Ramadan City

Tel         +2015 412 239 - 412 249 / +2010 002 0133

Fax        +2015 412 236

Cairo Office: 98 a Hassan Mamoun St. Naser City, Cairo Egypt

Tel         +2 02 22706306 - 2714 631 Fax +2 02 22752 701

KSA Factory: Rabigh - Yanbu High Way Exit 927 Industrial Zone Aramco Road

Tel:         +966 500 150 706 Fax : +966 500 592

Jeddah Office: Haifa Building. King Road  Jeddah City, Saudi Arabia

Tel         +966 2 2907382  Fax +966 2 6882901

www.energyasteel.com     info@energyasteel.com

Personal Mobile: + 2010 0400361     email: yassein.abdou@energyasteel.com

 

 


From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of Santosh Gaikwad
Sent: Wednesday, December 01, 2010 11:18 PM
To: materials-welding@googlegroups.com
Subject: [MW:8470] Joint Efficiency

 

Dear all,
my company is manufacturing ASME U Stamp vessel,as per the drawing one of the nozzle location is very closed to the dish head circumferential seam,even Dish head welding & nozzle welding are touching together .

is it acceptable as per ASME Sec VIII div I .

please do reply. 

--
Thanks & Regards.

Santosh Gaikwad

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

[MW:34820] RE: 34813] Clarification in Rate of heating and cooling.

Hello,   Please see the response below.   Regards.   P. Goswami, P. Eng, IWE.   From: materials-welding@googlegroups.com <materials-weld...