Monday, November 8, 2010

Re: [MW:8148] PQR &WPS FOR 24" PIPE LINE



FIRST YIOU HAVE TO MAKE A PROPOSED WPS , SECOND ACCORDING TO PWPS U HAVE TO CARRY OUT WELDING AND RECORD ALL READINGS IN ASM RUN SHEET, THEN TAKE rt of test piece. u have to carry out as per code / spec according to ur requirement.

then u carry out all mechnaical, physical test as per your code requirement.
then u prepare PQR PROCEDURE QUALIFICATION RECORD. FROM THIS pqr U CAN MAKE NO OF wps BY CONSIDERING ALL VARIABLES,

AS PER CODE SOME FORMAT CHANGES .
On Fri, 05 Nov 2010 12:05:10 +0530 wrote
>Dear all
how can i prepare a PQR and WPS for pipe line 24 " and what is the main items ihave to focis on
is there aform for that?

thanks
inspection engineer







--
>
To post to this group, send email to materials-welding@googlegroups.com
>
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
>
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
>
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
>


Dear Sir,





Thanking You,

Honesty is the best Policy

With Warm Regards,

Muthu Barathi P
Mobile No:00962788269821 (Jordan)
00962775401951

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding+unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

[MW:34820] RE: 34813] Clarification in Rate of heating and cooling.

Hello,   Please see the response below.   Regards.   P. Goswami, P. Eng, IWE.   From: materials-welding@googlegroups.com <materials-weld...