Dear members,
Is it mandatory to weld the nozzles on to the tank shell plating with the doubler plate? it is mud tank fabricated from 6 mm plate diameter 2800 mm. and all nozzles (6" pipies) shown on the drawings are welded without doubler plates.
The construction code is not given bu I assume that this is API 650.
brgds,
Elshan.
Subscribe to:
Post Comments (Atom)
[MW:34820] RE: 34813] Clarification in Rate of heating and cooling.
Hello, Please see the response below. Regards. P. Goswami, P. Eng, IWE. From: materials-welding@googlegroups.com <materials-weld...
-
Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? ...
-
Definition of buttering from ASME Section IX, QW/QB-492 Definitions: Buttering: the addition of material, by welding, on one or bot...
-
Section I. PRINT READING 3-1. GENERAL a. Drawings . Drawing or sketching is a universal language used to convey all necessary information to...