[MW:6833] MW: 6831] tempering temperature of P4 material

Takseen,

 

Aramco has tons of design specifications. I’ve many of them. Which specification applies to your project? What they’re asking for is based on good common sense engineering.

 

If you could let me know the specification no or email  me the specification  @ my personal email as below, I would get back to you.

 

Thanks.

 

Pradip Goswami,P.Eng.
Welding & Metallurgical Engineer/Specialist
Ontario Power Generation Inc.
Email-pgoswami@sympatico.ca,
pgoswami@quickclic.net

 

From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of THAKSEN INGOLE
Sent: Thursday, September 02, 2010 5:57 AM
To: material welding
Subject: [MW:6831] tempering temperature of P4 material

 


Dear all

There is a clause in Saudi Aramco documents stating as below

The maximum PWHT soaking temperature for quenched and tempered carbon steel and C-1/2Mo shall not exceed the temperature at which the test pieces were heat treated as shown on mill test reports or 650 deg C max for carbon steel ,690 deg C max for C-1/2 Mo and 700 for low Chrome alloy.

Our material is SA-387-Gr 12 cl2 (C -1/2Mo) which is P4 material. The min PWHT temp as per code (VIII Div 1-U stamp) is 650 deg C.

Now aramco has commented on our documents that they need a PWHT temperature to be 25 deg C less than tempering temperature as specified on MTC for the plates. So we need to have a tempering temp of min 680 deg C  so we can carry out the PWHT at 650 deg C but he plates MTC shows the tempering temp as 660 so we are 15-20 deg below. The plates are already purchased which are 65,70,80 mm thick.

My first query is no where in the aramco document we can find a clause of have PWHT temp 25 deg C less than tempering then what is the reason for asking this requirement.
What is the solution that we can offer them.

Regards
Thaksen  

 

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.


THIS MESSAGE IS ONLY INTENDED FOR THE USE OF THE INTENDED RECIPIENT(S) AND MAY CONTAIN INFORMATION THAT IS PRIVILEGED, PROPRIETARY AND/OR CONFIDENTIAL. If you are not the intended recipient, you are hereby notified that any review, retransmission, dissemination, distribution, copying, conversion to hard copy or other use of this communication is strictly prohibited. If you are not the intended recipient and have received this message in error, please notify me by return e-mail and delete this message from your system. Ontario Power Generation Inc.

No comments:

[MW:34820] RE: 34813] Clarification in Rate of heating and cooling.

Hello,   Please see the response below.   Regards.   P. Goswami, P. Eng, IWE.   From: materials-welding@googlegroups.com <materials-weld...