Re: [MW:6307] Asme Stamps according section VIII division 2

Dear Guttemberg Souza
You can not carry out any repair on the vessel, as it is ASME stamped vessel. Only ASME authorized shop can do the repair with application of R stamp. Again this will inspected by ASME authorized inspector. I suggest you carefully review the Manufacturer's Data Report of the vessel, there you will find parameters including RT done,during design & fabrication of the vessel. You can consult with agencies providing ASME inspection services viz LR insurance, Bureau Veritas, ABS etc for any advice.
 
Mhaskar Aly
Kuwait
 
 

From: guttemberg.souza <guttemberg.souza@uol.com.br>
To: materials-welding@googlegroups.com
Sent: Wed, August 4, 2010 1:26:31 AM
Subject: [MW:6299] Asme Stamps according section VIII division 2

Dear All,

Who can help me about a case regarding a pressure vessel stamped as "U2" which was manufactured, approved and shipped to the company i work for. But during the receiving inspection, in order to fit it to its final position, and according to internal inspection, some defects have been revealed on the visual weld inspection on the root of one of its nozzle like undercuttings, lack of fusion and concavity. We asked for the x-ray film to the manufacturer and they have sent to us but the result was approved. Then we have decided to perform another x-ray  on that joint to confirm the manufacturer x-ray, using the same x-ray techinique and the result revealed porosities out of ASME VIII div 2 requirements. So, in this case, if we decide to repair this joint, would we need to classify the vessel again ?

Best regards,


Guttemberg Souza

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

[MW:34820] RE: 34813] Clarification in Rate of heating and cooling.

Hello,   Please see the response below.   Regards.   P. Goswami, P. Eng, IWE.   From: materials-welding@googlegroups.com <materials-weld...