Hi,

Find some Information which can help regarding selection of Butt and Socket.

When do you NOT want to use socket-welded fittings?

- in severely vibrational services as others have said

- in severely corrosive or high purity services, because all socket-welded fittings contain a deep crevice ideal for corrosion

- for high toxicity services where a radiographic inspection of each weld's integrity is required

- where the flexibility analysis tells you that they're no good because of the stress intensification issues indicated above (a rarety if the piping is otherwise designed and supported correctly)

- in services with expensive materials of construction (i.e. titanium etc.), because the extra material required in the SW versus BW fittings will often eat any savings in welding cost (combined with the corrosion issue above!)

- any time your welders are not familliar enough with them to realize that they must be fit with a shrinkage gap- it's the fittings which have been bottomed in the socket before welding that are most prone to failure

- beyond about 3" pipesize, regardless

When do you WANT to use socket-welded fittings?  Virtually in all other circumstances where threaded connections have been ruled out.  Socket-welded piping is quicker and easier to both fit AND weld and hence is far less expensive than the butt-welded alternative.  Savings of 50%+ in installed cost can be expected in practice relative to butt welding.

Clearly your results may vary, but that's my take on the issue.  Be careful about axiomatic statements, whether from me or others, that you might hear on this site!  Case in point: unclesyd's "RTJ flanges are used on all heating fluid services".  Although I bow at unclesyd's feet as he is an extremely knowledgeable engineer and I listen carefully to what he says, there are plenty of places where ordinary raised-face gasketed ANSI flanges are perfectly fine for use with heating fluids.  Even 150# flanges, though I know there are people and companies which just say no to them for hot oil...


Regards,
SAHA

From: melyyan@gmail.com
To: materials-welding@googlegroups.com
Subject: [MW:6222] minimum butt weld joint
Date: Sat, 31 Jul 2010 19:05:10 +0400

Dear all;

 

I had a question regarding minimum butt weld joint?

 

Is there any code mentioning that NPS 2 & above shall be butt weld joints & less than 2" socket weld?

 

Please advice?

 

Regards

Majdi


--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

Comments

Popular posts from this blog

Re: [MW:34105] SA266 GR4N 4 Cycle SPWHT

Hi,  You are correct, Minimum refers to the one cycle for which this part will expose until final work shop PWHT. hence mill test certificate shall include this.  Max. SPWHT, refers to additional cycles of heat treatment that are reserved for future repairs during equipment lifetime.  Again, these simulated no. Of cycles shall be specified in MTC.  The idea is we need to make sure that steel mechanical properties are not compromised upon exposure to multiple repairs (i e 4 cycles in your case).  One could say, if steel is subjected to 4 cycles and is ok, then it should by defacto be good for one cycle, yet, this is wrong assumption cause mechanical problems and microstructure of materials varies accordingly based on no. Of cycles for which material will expose. This is apparent in alloy steel and especially for impact test values as an example.  In your case, this forged CS with properties before PWHT can be understood to be " as forged" condition (i.e. Wit...

Materails FAQs

Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? (asked by: boris.vielhaber@vait.com) A: DIN Nr. = 2393 T.2, 2394 T.2, EN 10025 W. Nr. DIN 17007 = 1.0038 Design DIN 17006 = RSt 37-2, S235JRG2 (Fe 360 B) Q: What is St DIN 2391 BK material? (asked by: dmcandrews@automaticstamp.com) A: Precision steel tubes, cold-finished/hard. Q: What is C.D.W. Boiler Tube? (asked by: montydude123@yahoo.com) A: Cold Drawn Welded Boiler Tube. Q: WHAT IS W.Nr. 1.4301? PLS TELL US IN EASY LANGUAGUE (asked...

Heat tint (temper) colours on stainless steel surfaces heated in air // Heat tint

Introduction The colour formed when stainless steel is heated, either in a furnace application or in the heat affected zone of welds, is dependent on several factors that are related to the oxidation resistance of the steel. The heat tint or temper colour formed is caused by the progressive thickening of the surface oxide layer and so, as temperature is increased, the colours change.   Oxidation resistance of stainless steels However, there are several factors that affect the degree of colour change and so there is no a single table of colour and temperature that represents all cases. The colours formed can only be used as an indication of the temperature to which the steel has been heated. Factors affecting the heat tint colours formed Steel composition The chromium content is the most important single factor affecting oxidation resistance. The higher the chromium, the more heat resistant the steel and so the development of the heat tint colou...