section 9. for more details, please click the link below:
http://frepd.com/2009/04/05/wps-procedures-qualification-1/
and this link :
http://frepd.com/2009/04/05/wps-procedures-qualification-2/
may be helpful
B & R
Achmed
On Aug 10, 10:20 am, manoj john <manojac...@gmail.com> wrote:
> Dear All,
>
> I have the following qualified WPS as per ASME sec. IX
>
> 1) Material Group : P1 (pipe - without backgouging)
> Welding process : SMAW
> Filler Metal : E 6010 Root run and E 7018 Subsequent run
>
> 2) Material group : P1 (plate - with back gouging)
> Welding process : FCAW
> Filler Metal : E71T
>
> Can I combine these above two WPS to weld Pipe of material SA 106 Gr B root
> run with SMAW E6010 and subsequent run FCAW E71T .
>
> Thank you with warm Regards,
> Manoj
--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
No comments:
Post a Comment