Sunday, July 25, 2010

[MW:6118] Post Forming Heat Treatment of NACT plates

Dear all
Can body share views on heat treat ment carried above tempering temperature for NACT plates? one of the case i have come across is stated below.

MOC: SA387 Gr11, Thickness 90mm, Delivery condition: Normalised+accelerated cooled+tempered (NACT)
Contract requirement: Cold formed D''end shall be normalised.
Since plate delivery condition is NACT, Mill certfies plate with 2NACT+3PWHT cycles on simulated coupons.
Fabricator will perform 2nd NACT (Fabricator assures that they do rapid quenching with water and tempering)  after cold forming (since normalising is mandatory irrespective % strain)

I am of the view that so far no mill has disclosed how will they perform NACT (complete cycle and cooling rates), thou Simulation is done at mill, in my opinion it is impossible to replicate the same NACT process at fab shop, and can't represent the simulation done at mill.

Also it is not known how mill perform accelerated cooling (by direct water quenching or water sprinklers or forced draft....?) one of the process photograph i have got on the web attached here with shows sprinklers .

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

[MW:34866] Presentation for WPS ,PQR AND WPQ as per ASME Sec IX in power point

Dear Experts.        If anyone having presentation of WPS,PQR and WPQ  as per ASME  SEC.IX  in power point then please share . Regards Sanja...