Gas Discharge Volume Bottle (508 O.DX2083 LG) Reinforcement pad -2 nos are missing which is used for sitting the vessel on the roller support

This pad is located in between Vessel & roller Support.

Fluid service: Gas

 The Pad Re-Installation will be rectified at site.

Contractor says that there is NO POST WELD HEAT TREATMENT for this vessel also this is a saddle pad and doesn't require pneumatic test of pad which is acceptable or not.

Pls. clarify this issue.
 
 
Thanks & Regards,
Praveen Kumar




--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

[MW:34916] Applicability of Impact requirement as per ASME B31.3

Dear All, Design code – ASME B31.3, Welding Code- ASME BPVC SEC IX Material  to be used used during Fabrication - SA 333Gr6 (P No.1 G...