Tuesday, June 1, 2010

Re: [MW:5328] Peaking & Bending Measurement of Welded Joints in Cylindrical Storage Tanks....

Dear Mr. Jose Sebastin
 
The sket you attached itself is self explanatory.  Distortion at the longitudial weld and circuferential weld are measured with these templates and it shall not exceed the figure you have given. For further clarification please feel free to call me on 09892193345 ( Mumbai)
 
Gopu

--- On Mon, 31/5/10, Jorge Mejía Lema <jmejialema@gmail.com> wrote:

From: Jorge Mejía Lema <jmejialema@gmail.com>
Subject: Re: [MW:5326] Peaking & Bending Measurement of Welded Joints in Cylindrical Storage Tanks....
To: materials-welding@googlegroups.com
Date: Monday, 31 May, 2010, 10:47 PM

Please,refer to API 650 Eleventh Edition, Addendum 2008, Numeral 7.5.2 Plumbness, 7.5.3 Roundness and 7.5.4 Local Deviations. All are very importand mesurement.
Regards,
jml
2010/5/31 jose seban <joseseban@gmail.com>
Dear Friends,

I am making fixed roof cylindrical oil storage tanks as per Indian
Standards IS-803.In section 9.3.5 it is mentioned about circularity
and shape.There it is mentioned about verticality & circularity
tolerences.Also it is mentioned about peaking and bending of welds
there..

1.Peaking of vertical weld joints measured over an arc length of 1 m
shall not exceed 12 mmm.

2.Bending of horizontal weld joints measured by a straightedge of 1 m
length shall not exceed 12 mm.

My questions are..

1.What is meant by this peaking and bending there?
2.How we will measure these factors?
3.How would the unit "millimetre" will come for these factors
measurement?
4.Is these 2 measurements are important in tank fabrication,if I am
checking vericality & circularity properly?


Regards,

Jose Sebastian,
Quality Manager,
Adani Power Limited,
Gujrat,India.
Mob:+919687660525

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.



--
Jorge Mejia Lema.
Especialista IV Mecánico.
Gerencia Tanques.
PBX: +57 (1) 3215801 Ext. 4094
FAX: +57 (1) 3215913
Cell: 3174793091
Carrera 11 No.71-73 Piso 10
ITANSUCA PROYECTOS DE INGENIERIA Ltda.
Bogotá, Colombia, Sur América
 


--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.

No comments:

[MW:34866] Presentation for WPS ,PQR AND WPQ as per ASME Sec IX in power point

Dear Experts.        If anyone having presentation of WPS,PQR and WPQ  as per ASME  SEC.IX  in power point then please share . Regards Sanja...