Hi, what will be the approximate length of line? You need to see that the line is not pressurized, If there are any vent valves on the lines release pressure and keep them open until welding of support pads/shoes is done. As Raj said preheating is required. (In the view of hydro testing If there are enough supports on the line regarding stability of line hydrotesting can be done and support pads/shoes can be welded latter and no need of any further hydrotesting) I do not think for every fabrication step there will be a code Ohm-Srinivas ohm guru namasivaya --- On Thu, 1/7/10, rajagopal kannan <rajagopal.kannan@gmail.com> wrote:
-- To post to this group, send email to materials-welding@googlegroups.com To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com For more options, visit this group's bolg at http://materials-welding.blogspot.com/ The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents. |
Thursday, January 7, 2010
Re: [MW:3991] RE: 3981] RE: 3979] Need confirmation as per code
Subscribe to:
Post Comments (Atom)
[MW:34866] Presentation for WPS ,PQR AND WPQ as per ASME Sec IX in power point
Dear Experts. If anyone having presentation of WPS,PQR and WPQ as per ASME SEC.IX in power point then please share . Regards Sanja...
-
Q: What are equivalents for standard Q 235 B (and Q 235 A) for U-channels? ...
-
Definition of buttering from ASME Section IX, QW/QB-492 Definitions: Buttering: the addition of material, by welding, on one or bot...
-
Section I. PRINT READING 3-1. GENERAL a. Drawings . Drawing or sketching is a universal language used to convey all necessary information to...