Hi,
I understand, you mention system is filled by water for hydro test, but hydro test not yet done.
And if Owner is allowing you to perform the welding, you should go ahead; regarding welding point of view, welding is allowable in piping when system is filled,
Even with hydro carbon and under pressure during HOT TAPPING WORK.
Sorry I right now I am not in position to find any code for you, for welding applicable, you should contact your QA/QC manager.
Thanks
With regards.
Dilip Kumar ( 帝力普 庫馬 )
P Note- Please consider the environment before printing this e-mail.
From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of Hamed
Sent: Thursday, January 07, 2010 3:54 PM
To: materials-welding@googlegroups.com
Subject: [MW:3981] RE: 3979] Need confirmation as per code
Hi
I never see in any standard or code to allow in this regard. So I think your Hydro test was rejected . you should release the water & weld the pad & again do the test.
Sincerely yours
Hamed Malekan
.Panahsaz Iran Eng. Co.
.Mechanical Expert (LPG Tanks in South Pars-Assaluyeh)
.Tel: +98 21 88801179 - Fax: +98 21 88900756
From: materials-welding@googlegroups.com [mailto:materials-welding@googlegroups.com] On Behalf Of nawab ali bhatti
Sent: Wednesday, January 06, 2010 2:42 PM
To: materials-welding@googlegroups.com
Subject: [MW:3979] Need confirmation as per code
Dear Members / Friends
I need code reference regarding following
Q.1: Client wants to weld pads without releasing water?
Q.2: Can weld without releasing water, if yes what problems will appear in future?
Q.3: If we can weld, what is the code / standard acceptance criteria?
subcontractor filled water for Hydrotest without completing the welding of some pads(plate 9mm) & shoe supports
Materials as following
1. Pipe Thickness is 23.83 mm
2. Dia 18"
3. Service : high pressure steam
4. Design pressure/temperature is 53.4 bar/427C
5. Test pressure is 148.2 Bar as per B31.3
--
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
Thursday, January 7, 2010
Re: [MW:3985] RE: 3981] RE: 3979] Need confirmation as per code
Hi,
If the owner permits you in writing you can do the welding. I think it will affect the structure of the material if you weld.
You try to convince the client and you can do the hydrotest and after drain the water you can do pneumatic test for the pad and LPT or MPI for the weld joint.
Thanks
With Best Regards.
John.
2010/1/7 ctcit-an&mma-Dilip Kumar <dilipkumar@ctci.co.th>
Subscribe to:
Post Comments (Atom)
Blog Archive
-
▼
2010
(5182)
-
▼
January
(225)
- Re: [MW:3937] WQT pipe dimensions
- [MW:3938] Welder Qlfn. Range wire and strip
- RE: [MW:3939] Metal Composition
- RE: [MW:3940] Metal Composition
- [MW:3941] Usage of Y strainer joint
- [MW:3942] Usage of A106 gr. B pipe
- [MW:3943] Re: 3928] Welder Qualification
- [MW:3944] Re: Usage of Y strainer joint
- [MW:3945] Re: Usage of A106 gr. B pipe
- Re: [MW:3948] Re: Usage of Y strainer joint
- Re: [MW:3949] Re: Usage of A106 gr. B pipe
- [MW:3947] PWHT
- [MW:3946] Overlay/cladding procedure
- Re: [MW:3950] PWHT
- Re: [MW:3951] PWHT
- [MW:3952] PWHT OF SS CLADED PR. VESSELS
- RE: [MW:3953] Re: Usage of A106 gr. B pipe
- Re: [MW:3954] PWHT
- [MW:3955] Need Code/Standard Reference
- [MW:3956] RE: 3946] Overlay/cladding procedure
- [MW:3957] API 5L -PSL 1 & PSL 2
- [MW:3958] Design of spacer & blanks as per EN 1348...
- Re: [MW:3959] API 5L -PSL 1 & PSL 2
- [MW:3961] FW: 3946-Overlay/cladding procedure
- Re: [MW:3960] API 5L -PSL 1 & PSL 2
- Re: [MW:3962] Design of spacer & blanks as per EN ...
- Re: [MW:3963] Re: Usage of A106 gr. B pipe
- Re: [MW:3964] API 5L -PSL 1 & PSL 2
- [MW:3965] welding procedure for the material at - ...
- Re: [MW:3966] welding procedure for the material a...
- Re: [MW:3967] welding procedure for the material a...
- [MW:3968] valve seat test
- Re: [MW:3969] welding procedure for the material a...
- Re: [MW:3970] welding procedure for the material a...
- [MW:3971] RE: 3968] valve seat test
- RE: [MW:3972] welding procedure for the material a...
- Re: [MW:3978] welding procedure for the material a...
- [MW:3974] MW:3972-welding procedure for the materi...
- Re: [MW:3973] welding procedure for the material a...
- [MW:3975] Allowable Nozzle Loads on Sulfur Storage...
- [MW:3976] RE: 3975] Allowable Nozzle Loads on Sulf...
- [MW:3979] Need confirmation as per code
- Re: [MW:3977] RE: 3975] Allowable Nozzle Loads on ...
- RE: [MW:3989] Need confirmation as per code
- [MW:3980] Role of 'Si'- welding
- [MW:3981] RE: 3979] Need confirmation as per code
- [MW:3982] RE: 3981] RE: 3979] Need confirmation as...
- Re: [MW:3983] RE: 3979] Need confirmation as per c...
- [MW:3990] WELDING CONSUMABLE FOR SMAW & SAW
- RE: [MW:3984] RE: 3979] Need confirmation as per c...
- Re: [MW:3985] RE: 3981] RE: 3979] Need confirmatio...
- Re: [MW:3986] RE: 3979] Need confirmation as per c...
- Re: [MW:3987] RE: 3981] RE: 3979] Need confirmatio...
- [MW:3988] Use meaningful, specific subject headers...
- Re: [MW:3991] RE: 3981] RE: 3979] Need confirmatio...
- [MW:3992] P1 Gr1 PQR with impact will support P1/S...
- [MW:3993] Re: P1 Gr1 PQR with impact will support ...
- FW: [MW:3995] Role of 'Si'- welding
- [MW:3994] FW: MW:3952- PWHT OF S.S CLADED PR. VESS...
- Re: [MW:3996] P1 Gr1 PQR with impact will support ...
- Re: [MW:3997] valve seat test
- [MW:3998] Re: WELDING CONSUMABLE FOR SMAW & SAW
- Re: [MW:3999] valve seat test
- [MW:4000] RE: 3998] Re: WELDING CONSUMABLE FOR SMA...
- RE: [MW:4001] Re: WELDING CONSUMABLE FOR SMAW & SA...
- Re: [MW:4002] P1 Gr1 PQR with impact will support ...
- [MW:4003] techniques for measuring residual stress...
- Re: [MW:4004] RE: 3998] Re: WELDING CONSUMABLE FOR...
- [MW:4005] UW-31 - Cutting, Fitting & Alignment, Fo...
- [MW:4006] cutting of 90 deg elbow in to 45 deg elb...
- [MW:4008] Vibration level for the horizontal centr...
- Re: [MW:4007] UW-31 - Cutting, Fitting & Alignment...
- [MW:4009] material procurment for liquid gas stora...
- [MW:4010] RE: 4006] cutting of 90 deg elbow in to ...
- [MW:4011] mode conversion & refraction of shear wa...
- [MW:4012] LIP type nozzle to shell/Head weld joint...
- Re: [MW:4016] LIP type nozzle to shell/Head weld j...
- [MW:4013] RE: 4012] LIP type nozzle to shell/Head ...
- Re: [MW:4014] mode conversion & refraction of shea...
- Re: [MW:4015] Re: WELDING CONSUMABLE FOR SMAW & SA...
- [MW:4017] RE: 4008] Vibration level for the horizo...
- RE: [MW:4020] LIP type nozzle to shell/Head weld j...
- Re: [MW:4018] RE: 4006] cutting of 90 deg elbow in...
- [MW:4021] material procurement for liquid gas stor...
- [MW:4019] Linear Indications After Pickling and pa...
- Re: [MW:4022] mode conversion & refraction of shea...
- [MW:4024] Pre qualified WPS for STR Steel
- [MW:4025] EQUIVALNET ASTM STANDARD FOR DN ST44
- Re: [MW:4023] Linear Indications After Pickling an...
- Re: [MW:4026] Pre qualified WPS for STR Steel
- Re: [MW:4027] EQUIVALNET ASTM STANDARD FOR DN ST44...
- Re: [MW:4030] RE: 4012] LIP type nozzle to shell/H...
- Re: [MW:4031] LIP type nozzle to shell/Head weld j...
- Re: [MW:4029] UW-31 - Cutting, Fitting & Alignment...
- [MW:4032] Impact
- FW: Re: [MW:4028] Linear Indications After Picklin...
- [MW:4037] Impact
- [MW:4038] RE: 4032] Impact
- Re: [MW:4033] Impact
- Re: [MW:4039] Impact
- RE: [MW:4034] Impact
- [MW:4035] Using of proper WPS
- Fw: [MW:4036] Linear Indications After Pickling an...
- Re: [Bulk] Fw: [MW:4040] Linear Indications After ...
- [MW:4041] Prequalified WPS for Str Steel welding
- [MW:4042] Preheat & PWHT values as per API 1104
- RE: [MW:4047] Prequalified WPS for Str Steel weldi...
- RE: [MW:4046] RE: 4006] cutting of 90 deg elbow in...
- [MW:4045] Magnetism in SS 304 & 321 after welding
- Re: [MW:4044] Prequalified WPS for Str Steel weldi...
- [MW:4043] Transition (pup pipes) testing requirmen...
- FW: [MW:4052] Preheat & PWHT values as per API 110...
- Re: [MW:4048] Preheat & PWHT values as per API 110...
- Re: [MW:4049] Linear Indications After Pickling an...
- Re: [MW:4050] Magnetism in SS 304 & 321 after weld...
- [MW:4051] RE: 4043] Transition (pup pipes) testing...
- [MW:4053] Acceptance for ERW pipes in place of SA...
- [MW:4055] RE: 4053] Acceptance for ERW pipes in ...
- [MW:4056] Flange design as per ASME Section VIII D...
- Re: [MW:4054] Acceptance for ERW pipes in place o...
- Re: [MW:4062] Acceptance for ERW pipes in place o...
- [MW:4057] CE of SA516 GR.70 with simulation requir...
- [MW:4058] Repair of Casting JIS G5501 FC25
- RE: [MW:4059] EQUIVALNET ASTM STANDARD FOR DN ST...
- Re: [MW:4060] Linear Indications After Pickling an...
- Re: [MW:4061] Flange design as per ASME Section VI...
- Re: [MW:4064] API 5L -PSL 1 & PSL 2
- [MW:4065] TRANSFER MODE & REQUIREMENT FOR GMAW&FCA...
- Re: [MW:4071] RE:???????
- Re: Re: [MW:4070] API 5L -PSL 1 & PSL 2
- Re: [MW:4069] RE:
- Re: [MW:4068] RE: 4043] Transition (pup pipes) tes...
- Re: [MW:4067] API 5L -PSL 1 & PSL 2
- Re: [MW:4066] Transition (pup pipes) testing requi...
- [MW:4072] composition manganese less than requirme...
- [MW:4082] RE: 4057] CE of SA516 GR.70 with simulat...
- [MW:4073] RE: 4072] composition manganese less tha...
- [MW:4074] RE: 4073] RE: 4072] composition manganes...
- Re: [MW:4081] composition manganese less than requ...
- Re: [MW:4080] RE: 4073] RE: 4072] composition mang...
- [MW:4075] Plug valve standard - API6D
- [MW:4079] RE: 4075] Plug valve standard - API6D
- RE: [MW:4078] composition manganese less than requ...
- [MW:4077] RE: 4075] Plug valve standard - API6D
- [MW:4076] 0.1% & 0.2% offset method
- [MW:4083] RE: 4074] RE: 4073] RE: 4072] compositio...
- Re: [MW:4084] Magnetism in SS 304 & 321 after weld...
- Re: [MW:4085] 0.1% & 0.2% offset method
- RE: [MW:4086] Radiographic testing in casting mate...
- Re: [MW:4087] Magnetism in SS 304 & 321 after weld...
- [MW:4088] Weld Efficiency
- [MW:4089] RE: 4088] Weld Efficiency
- [MW:4090] RE: 4089] RE: 4088] Weld Efficiency
- [MW:4091] RE: 4089] RE: 4088] Weld Efficiency
- Re: [MW:4094] RE: 4089] RE: 4088] Weld Efficiency
- Re: [MW:4093] Magnetism in SS 304 & 321 after weld...
- Re: [MW:4092] composition manganese less than requ...
- Re: [MW:4097] composition manganese less than requ...
- Re: [MW:4096] composition manganese less than requ...
- Re: Re: [MW:4095] Magnetism in SS 304 & 321 after ...
- FW: [MW:4098] RE: 4089] RE: 4088] Weld Efficiency
- RE: Re: [MW:4099] Magnetism in SS 304 & 321 after ...
- RE: [MW:4100] RE: 4089] RE: 4088] Weld Efficiency
- RE: [MW:4101] composition manganese less than requ...
- RE: [MW:4102] RE: 4089] RE: 4088] Weld Efficiency
- [MW:4108] essential variables in SAW PROCESS
- Re: RE: [MW:4103] composition manganese less than ...
- [MW:4105] Pitting acceptance criteria
- [MW:4104] Low hydrogen electrodes for station pipi...
- [MW:4106] essentials about SAW PROCESS
- Re: [MW:4109] Low hydrogen electrodes for station ...
- Re: [MW:4110] Pitting acceptance criteria
- Re: [MW:4111] Pitting acceptance criteria
- Re: [MW:4112] RE: 4089] RE: 4088] Weld Efficiency
- Re: [MW:4113] Pitting acceptance criteria
- Re: [MW:4114] Low hydrogen electrodes for station ...
- [MW:4117] Preparation of WPS
- Re: [MW:4118] Preparation of WPS
- RE: [MW:4119] Low hydrogen electrodes for station ...
- Re: [MW:4120] Pitting acceptance criteria
- [MW:4121] SA106GRB vs API5LGRB(seamless)
- RE: [MW:4122] Preparation of WPS
- [MW:4123] Demagnetization after completion of MPI ...
- [MW:4124] RE: 4117] Preparation of WPS
- RE: [MW:4125] Low hydrogen electrodes for station ...
- Re: [MW:4127] Pitting acceptance criteria
- Re: [MW:4126] Preparation of WPS
- Re: [MW:4130] Demagnetization after completion of ...
- Re: FW: Re: [MW:4131] Magnetism in SS 304 & 321 af...
- Re: FW: [MW:4132] Preparation of WPS
- [MW:4133] Is PCN L-III is qualified to certify ASN...
- Re: [MW:4135] Is PCN L-III is qualified to certify...
- [MW:4134] Welding of Rails & related components
- Re: [MW:4136] Is PCN L-III is qualified to certify...
- [MW:4137] TPED requirment on UN Portable Tank.
- Re: [MW:4138] Is PCN L-III is qualified to certify...
- Fw: Re: Re: [MW:4143] Pitting acceptance criteria
- Re: [MW:4139] RE: 4057] CE of SA516 GR.70 with sim...
- Re: [MW:4140] Is PCN L-III is qualified to certify...
- Re: [MW:4141] RE: 4117] Preparation of WPS
- Re: [MW:4142] Is PCN L-III is qualified to certify...
- Re: Fw: Re: Re: [MW:4144] Pitting acceptance crite...
- [MW:4145] Duration record retention for ASME 31.1 ...
- Re: Re: [MW:4146] Magnetism in SS 304 & 321 after ...
- Re: [MW:4147] FW: 4106] essentials about SAW PROCE...
- FW: [MW:4148] FW: 4106] essentials about SAW PROCE...
- [MW:4149] SAW PROCESS and FCAW backing question
- [MW:4150] ASME SEC IX...PWHT?
- [MW:4151] RE: 4150] ASME SEC IX...PWHT?
- Re: [MW:4152] ASME SEC IX...PWHT?
- [MW:4153] Fillet weld qualification in 2F position...
- Re: [MW:4155] ASME SEC IX...PWHT?
- [MW:4154] enclosed arc welding
- [MW:4156] RE: 4151] RE: 4150] ASME SEC IX...PWHT?
- [MW:4159] Sulfur prints
- [MW:4160] Underclad cracking tests
- Re: [MW:4157] RE: 4151] RE: 4150] ASME SEC IX...PW...
- Re: [MW:4158] RE: 4151] RE: 4150] ASME SEC IX...PW...
- [MW:4162] RE: 4159] Sulfur prints
- FW: [MW:4161] Underclad cracking tests
- Re: FW: [MW:4163] Underclad cracking tests
- Re: Re: FW: [MW:4164] Underclad cracking tests
- Re: FW: [MW:4165] Underclad cracking tests
- [MW:4166] what is SR and how it is done
- [MW:4167] DFT measurement
-
▼
January
(225)
No comments:
Post a Comment