Hi,
I understand, you mention system is filled by water for hydro test, but hydro test not yet done.
And if Owner is allowing you to perform the welding, you should go ahead; regarding welding point of view, welding is allowable in piping when system is filled,
Even with hydro carbon and under pressure during HOT TAPPING WORK.
Sorry I right now I am not in position to find any code for you, for welding applicable, you should contact your QA/QC manager.
Thanks
With regards.
Dilip Kumar ( 帝力普 庫馬 )
P Note- Please consider the environment before printing this e-mail.
From:
Sent: Thursday, January 07, 2010 3:54 PM
To:
Subject: [MW:3981] RE: 3979] Need confirmation as per code
Hi
I never see in any standard or code to allow in this regard. So I think your Hydro test was rejected . you should release the water & weld the pad & again do the test.
Sincerely yours
Hamed Malekan
.Panahsaz Iran Eng. Co.
.Mechanical Expert (LPG Tanks in South Pars-Assaluyeh)
.Tel: +98 21 88801179 - Fax: +98 21 88900756
From:
Sent: Wednesday, January 06, 2010 2:42 PM
To:
Subject: [MW:3979] Need confirmation as per code
Dear Members / Friends I need code reference regarding following Q.1: Client wants to weld pads without releasing water? Q.2: Can weld without releasing water, if yes what problems will appear in future? Q.3: If we can weld, what is the code / standard acceptance criteria? subcontractor filled water for Hydrotest without completing the welding of some pads(plate 9mm) & shoe supports Materials as following 1. Pipe Thickness is 23.83 mm 2. Dia 18" 3. Service : high pressure steam 4. Design pressure/temperature is 53.4 bar/427C 5. Test pressure is 148.2 Bar as per B31.3 |
No comments:
Post a Comment