Friends,
While fabricating pipe spools as per ASME B31.3, A pipe welded with an Orifice flange was undergone PWHT in the furnace ( the branch nozzle on the orifice flange was not welded before PWHT ) and the contractor wants to weld the branch nozzle on the Orifice flange after PWHT & doesn't want to carryout local PWHT.
Is it acceptable??????? or the preheat & inter pass temperature shall be minimum 150 Deg Celsius.
Regards,Tulasi Ramu
--~--~---------~--~----~------------~-------~--~----~