Thursday, May 28, 2009

[MW:2259] UT in lieu of RT

Dear All members,
I really need you expertise opinion on the above mentioned subject. Basically our project(new piping installation) requirement is RT but we having a lot of problems to do it. One of the major problem is the window which is very limited. To avoid any backlog i purpose to my boss to go for UT instead of RT. It is permissible by the code and standards to do UT instead of RT. Which code and standard we should refer?. Thank in advance for your kind cooperation

--~--~---------~--~----~------------~-------~--~----~
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
-~----------~----~----~----~------~----~------~--~---

No comments:

[MW:34916] Applicability of Impact requirement as per ASME B31.3

Dear All, Design code – ASME B31.3, Welding Code- ASME BPVC SEC IX Material  to be used used during Fabrication - SA 333Gr6 (P No.1 G...