Dear Ali asgari,
 
You can try the same by wounding the cable on magnetised pipe and weld on anothe plate with 5 mm electrode with maximum possible current. You may have burn 15 to 20 electode to remove the magnetism.
 
Regards,
 
Muhammed Ibrahim PK

2009/5/5 Ali Asghari <asghariali@rocketmail.com>
hi
i encounter to a problem  in fabrication a frame from X52N,during specially in overhead and vertical positions(in one T joint) the arc doesn't melt the bevels.
i think this is for arc blow,because in different locations weldings are be done ,suppose to earth cable turned around one pipe but the problem existed yet.
how can i solve this problem?
rjd






--
Thanks & Regards
Muhammed Ibrahim PK

--~--~---------~--~----~------------~-------~--~----~
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
-~----------~----~----~----~------~----~------~--~---

No comments:

[MW:34916] Applicability of Impact requirement as per ASME B31.3

Dear All, Design code – ASME B31.3, Welding Code- ASME BPVC SEC IX Material  to be used used during Fabrication - SA 333Gr6 (P No.1 G...