Dear All,
In our our Pipeline Project in Kazakhstan, As we have problem in
procuring Welding consumables from one manufacturer we had to qualify
to Welding procedures 20" Mainline welding.

The first procedure is with E 6010 root and balance pases with E 8018G
(all downhill) we have also seprate repair procedure with only change
being E 6010 with uphill process.

Also we have qualified another procedure with E 6010 for root and Hot
pass (Down hill) and E 7016 uphill for balance passes.

Please advice if we need to qualify another repair procedure for our
second procedure or we can use the first repair procedure for all
repairs.

Regards

S Babu

--~--~---------~--~----~------------~-------~--~----~
To post to this group, send email to materials-welding@googlegroups.com
To unsubscribe from this group, send email to materials-welding-unsubscribe@googlegroups.com
For more options, visit this group's bolg at http://materials-welding.blogspot.com/
The views expressed/exchnaged in this group are members personel views and meant for educational purposes only, Users must take their own decisions w.r.t. applicable code/standard/contract documents.
-~----------~----~----~----~------~----~------~--~---

No comments:

[MW:34916] Applicability of Impact requirement as per ASME B31.3

Dear All, Design code – ASME B31.3, Welding Code- ASME BPVC SEC IX Material  to be used used during Fabrication - SA 333Gr6 (P No.1 G...